LIMESTONE HYDROELECTRIC DEVELOPMENT, NELSON RIVER, MANITOBA |
||
|
FRAZIL ICE ACCUMULATION |
|
||
|
EXPO 67, MONTREAL |
||
|
|
|||
![]() |
|||
|
Environmental
impact study of the Grand-Mère hydroelectric development: site observations
and participation in the Saint-Maurice river ice covers study committee.
|
|||
|
Study of the
partial diversion of the Romaine river to the Churchill Falls complex
(Hydro-Québec). Site survey, water temperature measurements and numerical
modelling of the ice conditions in the Atikonak lake and river (Labrador).
|
|||
|
Muskrat Falls
hydroelectric development (Churchill Falls Company, Labrador). Numerical
modelling of ice cover formation and stability during temporary diversion.
|
|||
|
CF2 project
(Churchill Falls Company, Labrador). Numerical modelling of the ice conditions
resulting from an increase in the flow rate to the Smallwood reservoir.
|
|||
|
EM-1 project
(Hydro-Québec). Study of the hydraulic conditions in the Wabamisk channel
following the partial diversion of the Rupert river.
|
|||
|
EM-1 project
(Hydro-Québec). Thermal regime of the reservoir - Frazil ice generation
and water levels downstream of the power plant.
|
|||
|
EM-1 project
(Hydro-Québec). Numerical modelling of the winter hydraulic conditions
along the diversion channels of the Eastmain and Rupert rivers.
|
|||
|
Portneuf river
(Innergex). Ice conditions between the PN-2 and PN-3 power plants.
|
|||
|
Chaudière Falls
mini-hydroelectric station (Innergex). Study of the winter hydraulic conditions
in the upstream reach.
|
|||
|
Chute-Garneau
and Pont-Arnaud developments on the Chicoutimi river (Hydro-Québec). Emergency
measures to ensure ice cover formation during the first winter following
the July 1996 flood.
|
|||
|
Saint-Jean,
À-Mars and Ha! Ha! rivers: Ice conditions for the winters following the
exceptional flood in the summer of 1996. Analysis to determine the remedial
works required.
|
|||
![]() |
![]() |
|
|